About
Services
Products
Projects
Insights
Resources
Contact

Armatec Environmental Ltd

About
Services
Products
Projects
Insights
Resources
Contact
E-Trap product.png
etrap install.png
Floor traps are installed before the flooring

Floor traps are installed before the flooring

Floor traps and connecting underground fibreglass pipe are preferably installed to grade before the concrete floors are poured at new sites.

No maintenance required

No maintenance required

All fibreglass pipe joints underneath the slab are done by butt and strap, and will require no further maintenance. Pipes are then connected to fibreglass manholes located outside the building perimeter.

1 2 3 4
Previous Next
E-Trap product.png
etrap install.png
Floor traps are installed before the flooring
No maintenance required

Subscribe

Sign up with your email address to receive news and updates.

We respect your privacy.

Thank you!
Back to Top
Contact Us
Who we are
Terms of Trade
Terms of Use
Privacy Policy
Cookies
Armatec Environmental Ltd, 42 Egmont Road, New Plymouth 4312, New Zealand+64 6 7550410ENQUIRIES@ARMATEC.CO.NZ